PERBAIKAN SISTEM KERJA UNTUK MENINGKATKAN KAPASITAS PRODUKSI KERAJINAN BERBAHAN LIMBAH KAYU (DRIFTWOOD)

  • I Gede Nyoman Suta Waisnawa Teknik Mesin Politeknik Negeri Bali
  • I Made Sudana Teknik Mesin Politeknik Negeri Bali
  • Ida Bagus Swaputra Jurusan Manajemen STIMI Handayani Denpasar

Abstract

The work system analysis at Ari Deco and Kubu Shop mainly improves work system and material flow as well as grouping process that can minimize the time of movement, improve worker comfort on production activity, utilization of production process space become safe and flexible. A good layout will provide a larger output with the same or fewer costs, smaller man hours, reducing machine work hours. Zig-Zag flow pattern is used for production process longer than area, Output achieved is Work Station arranged, efficient material flow layout supported by adequate tooling so that able to optimize achievement of production target. Improving and saving the use of materials, tools, and utilization of human effort and providing a comfortable and safe working environment. The impact of the program is the increase of production capacity of artisans of Ari Deco by 67.5% and Kubu Shop by 46.15% while the craftsmen turnover is about 69.9% (sales per September 2016 is Rp.187.605.000).

Published
2017-11-18
How to Cite
WAISNAWA, I Gede Nyoman Suta; SUDANA, I Made; SWAPUTRA, Ida Bagus. PERBAIKAN SISTEM KERJA UNTUK MENINGKATKAN KAPASITAS PRODUKSI KERAJINAN BERBAHAN LIMBAH KAYU (DRIFTWOOD). Seminar Nasional Pengabdian kepada Masyarakat, [S.l.], v. 2, p. 336-342, nov. 2017. Available at: <http://eproceeding.undiksha.ac.id/index.php/senadimas/article/view/1098>. Date accessed: 23 july 2019.
Section
Articles